When: 2022 - 2024

Location: Neom, Saudi Arabia

Industry: Construction & Infrastructure

Client Overview

The Neom Authority oversees the development of Neom, a groundbreaking megaproject in Saudi Arabia, which includes The Line, necessitating extensive logistics like access tunnels.

case-study
case-study

Challenge

Byrne was tasked with providing a reliable power solution to support the logistics and construction of the ADIT 3N Access Tunnel and West Portal. This required high power availability and continuous operational support to prevent delays during tunnel drilling.

Solution

Byrne’s comprehensive approach included:

High Capacity Power Supply: Installed 7 MW to fulfill the
energy demands of drilling operations, ensuring stable power distribution via reliable generator sets and distribution boxes.

Robust Power Infrastructure: An integrated fuel system ensured uninterrupted power generator operation, while advanced distribution boxes facilitated efficient power management across the construction site.

Operational Support: Continuous maintenance and support services were provided, employing proactive strategies to minimize downtime and swiftly address any challenges.

case-study

Result

Byrne’s power solution for the Neom ADIT 3N Access Tunnel successfully delivered continuous and reliable power for tunnel drilling, minimizing downtime and achieving high client satisfaction. This project highlights Byrne’s capability to provide dependable power solutions in complex construction environments, positioning the company as a trusted partner for future transformative initiatives like Neom.