When: 2024

Location: Five Remote Drilling Sites, Saudi Arabia

Industry: Oil & Gas

Client Overview

Our client needed scalable remote camp infrastructure to support 800 staff across five isolated drilling sites in Saudi Arabia.

case-study
case-study

Challenges

The project required the rapid deployment of large-scale camp infrastructure across multiple remote drilling locations with limited access and harsh operating conditions. Supporting 800 personnel demanded continuous power, lighting, water, sanitation, and housekeeping services while maintaining high safety standards. The camps also needed to operate 24/7, requiring reliable logistics, on-site operational management, and seamless coordination across all five sites to ensure uninterrupted drilling activities.

Solution Provided

Byrne delivered:

  • Infrastructure Deployment: Supplied over 250 modular units across five camps, including offices, sleeping quarters, kitchens, and ablutions.

  • Power & Lighting: Installed generators and lighting towers to ensure 24/7 operations.

  • Essential Services: Provided essential services including water, sewage management, fuel, and housekeeping for workers, management, and security.

  • Ancillary Support: Managed logistics, installation, and operation to ensure optimal camp performance and safety.

case-study
case-study

Operational Support

Our teams remained on-site, overseeing operations, maintenance, safety, and efficiency across all five camps.

Result

The successful delivery of the remote camps ensured safety, comfort, and operational continuity across multiple drilling sites.