BYRNE has successfully delivered a large-scale superheated steam boiler package for a major petrochemical turnaround project in Saudi Arabia, setting a new benchmark in thermal engineering execution.

Designed for high-temperature, moisture-free performance, the deployed superheated steam solution provided absolute control and reliability under demanding turnaround conditions.

News Section Image

Why Superheated Steam Matters

Superheated steam carries higher thermal energy with zero moisture, making it ideal for:

  • Tank-farm heating

  • High-temperature industrial processes

  • Applications requiring precise thermal control and consistent output

This makes it a critical utility during complex petrochemical shutdowns and maintenance programs.

News Section Image

Project Snapshot

  • Largest superheated steam boiler package in KSA

  • Two systems delivered:

    • 15 bar @ 250°C

    • 5 bar @ 170°C

  • Executed in record time during a major petrochemical turnaround

  • End-to-end delivery covering engineering, logistics, commissioning, and 24/7 site operation

  • Delivered with zero safety compromise

News Section Image

Engineering Performance Under Pressure

The successful execution of this project highlights BYRNE’s ability to deliver high-energy thermal solutions with precision, speed, and operational discipline—especially during time-critical shutdown environments.

Whether supporting steam, chilled water, or air-cooling requirements, BYRNE continues to engineer systems that perform when it matters most.

BYRNE — Engineering Performance, Powering Progress.

News Section Image

Related articles

BYRNE Delivers Superheated Steam Boiler Package for Petrochemical Turnaround in KSA

03/12/2025

BYRNE Delivers Superheated Steam Boiler Package for Petrochemical Turnaround in KSA

BYRNE deploys the largest superheated steam boiler package in KSA...

read more
Powering Progress in Oil & Gas: Byrne Deploys 8 MVA Generator Setup for ADNOC Unconventional Project

10/12/2025

Powering Progress in Oil & Gas: Byrne Deploys 8 MVA Generator Setup for ADNOC Unconventional Project

Byrne delivers an 8 MVA turnkey generator power setup supporting ...

read more
Byrne Equipment Rental Recognised as ADIPEC Impact Champion 2025 | Featured by Gulf Construction Magazine

24/11/2025

Byrne Equipment Rental Recognised as ADIPEC Impact Champion 2025 | Featured by Gulf Construction Magazine

Gulf Construction Magazine features Byrne Equipment Rental for be...

read more