Byrne Equipment Rental recently delivered a tailored mast climber access solution for a landmark commercial and leisure development in Riyadh — one of the largest ongoing construction projects in the Middle East.

We supplied 31 mast climbing work platforms (AC13000 & MC450) to support high-level façade installation at heights of up to 20 metres. This innovative alternative to traditional scaffolding significantly enhanced site productivity, improved worker safety, and ensured time-saving project execution.

The combination of AC13000 double-decker units and MC450 configurations offered optimal load capacity and flexibility, allowing smooth vertical access throughout the complex structure. Our engineering team provided full technical support, ensuring precision installation and operational efficiency on-site.

At Byrne, we take pride in delivering smart access equipment solutions that meet the evolving demands of modern construction. From mast climber hire to full construction hoist systems, we support contractors across the region with reliable, safe, and cost-effective access platforms.

Explore our complete range of mast climbers and vertical access solutions in the section of Hoists & Mast Climbers Archives – Byrne Equipment Rental.

News Section Image

Related articles

Byrne Recognised by GE Vernova as Best Supplier in Saudi Arabia

15/10/2025

Byrne Recognised by GE Vernova as Best Supplier in Saudi Arabia

Byrne Equipment Rental has been recognised as Best Supplier at th...

read more
Byrne Oman Joins OPAL OMAN – Strengthening Our Commitment to Oman’s Energy Future

15/10/2025

Byrne Oman Joins OPAL OMAN – Strengthening Our Commitment to Oman’s Energy Future

Muscat, Oman – Byrne Equipment Rental is proud to announce that B...

read more
Byrne in Focus – Featured in Inside Oil & Gas

27/08/2025

Byrne in Focus – Featured in Inside Oil & Gas

We are proud to be featured in the latest edition of Inside Oil &...

read more